SPECIFIC LABORATORY ASSIGNMENTS
FOR BISC207-081, FALL 2007

Writing Assignments, when due, should be handed in at the beginning of lab (there are exceptions for 10/25 & 11/21 shown below).
Flow Charts (work plans) are also due for some labs. You should make two copies - one to turn in at the beginning of lab (to be graded), the other to use during the lab.

Lab and Date

          Assignment for Lab*

Lab 1 – 9/12
Microscopy
 Pre-lab Quiz 1; no written assignment due
Lab 2 – 9/19
BSA
Flow Chart #1 for Lab 2 is due
Brief Report #1 from lab 2 due on 9/26
Lab 3 – 9/26
Extraction of DNA and chlorophyll

Brief Report #2 due on 10/3
Lab 4 – 10/3  Scientific Method
Long Report #1 on Lab 4 will be due on 10/10
Lab 5 – 10/10 Catalase I
Flow Chart #2 for Lab 5 is due

Lab 6 – 10/17
Catalase II - Independent Investigation
Long Report #2 on Lab 6 due 10/25 9:00 a.m. by electronic submission to TA
(Note:
you are given an extra day because of lecture exams on 10/24)
Lab 7 – 10/31 Osmosis
Flow Chart #3 for Lab 7 is due
Long Report #3 is due on 11/7

Lab 8 – 11/7  Photosynthesis I
 Brief Report #3 due on 11/14


Lab 9 – 11/14
Photosynthesis II
Long Report #4 on Lab 9 is due on 11/21 at 9:00 a.m. by electronic submission to TA
Lab 10 – 11/28
Lab Exam

* If you collect data on your computer, please do not delete it until told to do so. It may be necessary to check your raw data when reading your reports.